Westwood Park Survey – Results and way ahead
- 186 results were received, by 8 Sep 26 and in general, there was a positive response to almost all proposals. Those proposals which had 80% or more support include many of which could be implemented quickly and at little cost and these will be formally proposed at the meeting on 5th October 2026 commencing at 6.00 pm at the Parish Rooms.
- 1.01. Wildflower Beds (87%)
- 1.02. Meadow Grass (in the north area of the park) (83%)
- 1.03. Wildflower Islands around trees (95%)
- 1.07. Improved Airshaft Screening (81%)
- 1.12. Dead Hedging (81%)
- 1.13. Bird / Bat / Insect Boxes (93%)
- 2.11. Additional litter bin (97%)
- 3.01. Village Picnic Events (88%)
- 3.04. Cherry Blossom Village Day (84%)
- 3.05. Westwood Park Volunteer group (89%)
- 4.04. Establish a two valleys nature trail (82%)
- 5.01. Rainwater capture system (80%)
- 5.03. Wood mulching (89%)
- Other items that had strong support but requires further consultation and consideration of implementation:
- 1.04. flower beds (76%) – concerns about cost and maintenance
- 1.05. Vegetable beds in park building garden (64%) – concerns about cost and maintenance – this is MIMG’s responsibility.
- 1.06. Plant additional Fruit and nut trees (75%) – concerns about rotten fruit left not he ground – this might be better in the community orchard.
- 1.07. Espalier Fruit Trees (63%) – concerns about maintenance and impact on boundary walls.
- 2.01. Kids Bike Track (65%) – concern about cost (£500), noise, buzziness and safety.
- 2.03. Outdoor Fitness Equipment (59%) – concerns about over developing the park, possibly consider aesthetics and incorporating in kids play area.
- 2.04. Boules Court (56%) – concerns regarding cost, maintenance and over development of the park.
- 2.07. Shade (65%) – concerns regarding cost, maintenance & practicality.
- 2.12. Low level lighting (78%) – concerns regarding light pollution and cost.
- 3.03. Family Rounders Games (74%) – concerns regarding noise and buzziness.
- 4.01. Nature and Heritage Displays (74%) – concerns regarding over development of the park.
- 4.02. Arts and Crafts Workshops (76%) – unclear why there are objections Educational Tours (79%) – unclear why there are objections
- 5.04. New Bus Shelter and Bench (75%) – concerns about cost.
- Items which were rejected include:
- 2.05. Outdoor Table Tennis (44%) – concerns about vandalism, cost, maintenance, practicality, and park clutter.
- 2.06. Airshaft Roof Garden (47%) – concerns about cost, safety and over development of the park.
- 2.08. BBQ / Exercise Area (33%) – concerns about vandalism, cost, maintenance, safety, practicality, and park clutter.
- 2.09. Dog Agility Area (8%)
- 2.10. Park Sculptures (24%)
- 5.05. Re-purpose Airshafts (47%) – concerns about bats, vandalism, cost, maintenance, practicality, and park clutter (not also owned by the PC)
- 5.06. Replace concrete bollards (42%) – concerns about cost.
- Proposed way forward:
- An entry will be placed in the Westwood Update to advise that the survey results are available on the PC website as well as a posted, in due course on the PC notice boards. An open forum will be held at 6pm in the Parish Rooms on Monday 5 October 2026 at which the survey results will be presented and proposals discussed further.
- Low-cost proposals with strong support (80% or more) to be costed and presented to the Parish Council for approval at a future Council meeting and funds allocated to proceed (to include solutions for implementation and maintenance).
- Open forum and presentation to be given in the Parish Rooms at 6pm on 5 Oct 26 prior to the next PC meeting.
- 5-year implementation plan to be developed (to be formally proposed and agreed at a future Council meeting).
- Further consultations for specific higher cost proposals.
