Westwood Park – Detailed survey results

For more details on the park survey please click onto the following link

Park Survey – one page summary

Westwood Park Survey – Results and way ahead

  1. 186 results were received,  by 8 Sep 26 and in general, there was a positive response to almost all proposals. Those proposals which had 80% or more support include many of which could be implemented quickly and at little cost and these will be formally proposed at the meeting on 5th October 2026 commencing at 6.00 pm at the Parish Rooms.
  • 1.01.    Wildflower Beds (87%)
  • 1.02.    Meadow Grass (in the north area of the park) (83%)
  • 1.03.    Wildflower Islands around trees (95%)
  • 1.07.    Improved Airshaft Screening (81%)
  • 1.12.    Dead Hedging (81%)
  • 1.13.    Bird / Bat / Insect Boxes (93%)
  • 2.11.    Additional litter bin (97%)
  • 3.01.    Village Picnic Events (88%)
  • 3.04.    Cherry Blossom Village Day (84%)
  • 3.05.    Westwood Park Volunteer group (89%)
  • 4.04.    Establish a two valleys nature trail (82%)
  • 5.01.    Rainwater capture system (80%)
  • 5.03.    Wood mulching (89%)
  1. Other items that had strong support but requires further consultation and consideration of implementation:
  • 1.04. flower beds (76%) – concerns about cost and maintenance
  • 1.05.   Vegetable beds in park building garden (64%) – concerns about cost and maintenance – this is MIMG’s responsibility.
  • 1.06.   Plant additional Fruit and nut trees (75%) – concerns about rotten fruit left not he ground – this might be better in the community orchard.
  • 1.07.   Espalier Fruit Trees (63%) – concerns about maintenance and impact on boundary walls.
  • 2.01.   Kids Bike Track (65%) – concern about cost (£500), noise, buzziness and safety.
  • 2.03.   Outdoor Fitness Equipment (59%) – concerns about over developing the park, possibly consider aesthetics and incorporating in kids play area.
  • 2.04.   Boules Court (56%) – concerns regarding cost, maintenance and over development of the park.
  • 2.07. Shade (65%) – concerns regarding cost, maintenance & practicality.
  • 2.12.   Low level lighting (78%) – concerns regarding light pollution and cost.
  • 3.03.   Family Rounders Games (74%) – concerns regarding noise and buzziness.
  • 4.01.   Nature and Heritage Displays (74%) – concerns regarding over development of the park.
  • 4.02.   Arts and Crafts Workshops (76%) – unclear why there are objections Educational Tours (79%) – unclear why there are objections
  • 5.04.   New Bus Shelter and Bench (75%) – concerns about cost.

 

  1. Items which were rejected include:
  • 2.05.    Outdoor Table Tennis (44%) – concerns about vandalism, cost, maintenance, practicality, and park clutter.
  • 2.06.    Airshaft Roof Garden (47%) – concerns about cost, safety and over development of the park.
  • 2.08.    BBQ / Exercise Area (33%) – concerns about vandalism, cost, maintenance, safety, practicality, and park clutter.
  • 2.09.    Dog Agility Area (8%)
  • 2.10.    Park Sculptures (24%)
  • 5.05.    Re-purpose Airshafts (47%) – concerns about bats, vandalism, cost, maintenance, practicality, and park clutter (not also owned by the PC)
  • 5.06.    Replace concrete bollards (42%) – concerns about cost.
  1. Proposed way forward:
  • An entry will be placed in the Westwood Update to advise that the survey results are available on the PC website as well as a posted, in due course on the PC notice boards. An open forum will be held at 6pm in the Parish Rooms on Monday 5 October 2026 at which the survey results will be presented and proposals discussed further.
  • Low-cost proposals with strong support (80% or more) to be costed and presented to the Parish Council for approval at a future Council meeting and funds allocated to proceed (to include solutions for implementation and maintenance).
  • Open forum and presentation to be given in the Parish Rooms at 6pm on 5 Oct 26 prior to the next PC meeting.
  • 5-year implementation plan to be developed (to be formally proposed and agreed at a future Council meeting).
  • Further consultations for specific higher cost proposals.

Westwood Park – Shaping its future, an opportunity for residents to comment

Westwood residents are invited to help shape the future of our much-loved park by completing the survey at the following link [https://forms.gle/zWsjTNpLUgduZVfH6].  You will need to allow 5-10 minutes to complete the  survey which will be available online from 1-31 August 2026. Provision has also been made for comments and recommendations to be added at the end of the survey should you wish. Additional information can be found in the attached presentation which sets out where various projects might be implemented around the park. An open forum will also be held at the Park Building / Wildflower Cafe in early September to answer any questions and address any residents concerns regarding the park’s future. Should you wish to compete the survey manually, hard copies will be provided in the Park Building / Wildflower Cafe and may be posted in the box provided or sent directly to the clerk e mail clerk@westwoodparishcouncil.gov.uk or by post to 3 Avonfield Avenue Bradford on Avon BA15 1JD

The following link provides further information

Westwood Park Plan Supporting Vision August 2026

 

Westwood Update 20 June July

The following is the latest update

Update 20

Vacancies on Westwood Parish Council

Following the decision of 2 councillors not to stand for re election at the recent Council elections there are a number of opportunities for individuals to serve the village. The following provides more details, just click on the click to find out more:

Vacancies on Westwood Parish Council (2)

Westwood Park Building – Latest

Update on future of the Park Building Upper Westwood.

Your Parish Council are currently in discussions with a Community Interest Company, “Meadow in MY Garden” and plans are progressing to allow them use of the building (excluding the Garage). They currently plan to occupy the building 3 days a week and some weekends.

The proposal is that the cost to the Parish Council (and subsequently to residents) be cost neutral and to achieve this the tenant will be responsible for all utilities (Water Rates, Business Rates, Gas, Electricity).

As the ownership of the building remains with the Parish Council (PC) the responsibility for maintenance/repair remains (as it has always been) with the PC but some work is required to make the building suitable for its use.

This requires up to date re certification of fire safety, gas safe and electricity, some internal refurbishment, painting and clearance of any excess materials. A replacement adult toilet facility is required along with the hiring of multiple “skips” to remove excess materials in the garden area.

Estimates/quotes are being sought for works but the current best guess of costs to refurbish the area, including legal costs to prepare the lease are estimated in the region of £5000.

An extraordinary meeting will be arranged to approve all expenditure once agreement has been agreed with Message in My Garden, and details of the meeting will be published on both village noticeboards and website. However, any points/questions that you wish to be raised can be forwarded by e mail to clerk@westwoodparishcouncil.gov.uk.

Proposal for use of Westwood Park Building

The following link is a proposal that is currently being considered by your Parish Council. The next edition of Westwood Update will also contain information and it is suggested that both be read in conjunction with each other. There are many hoops to go through before we get to our destination but all those involved in the Parish Council are working very hard to try and achieve a successful outcome. You will see in the link that there is work proposed in separate phases but only phase 1 is currently being considered. Completion of this will make the building both more appealing to a user and certainly more habitable. Further works will be considered reliant on the success of MMIG and community support. The building use is governed by some covenants which means we have to write to the holders of these to advise them of the proposed use. In addition we have to advise some authorities of a change of use which may require a formal planning application. Externally there is work to be done on the garage, outbuildings and groundworks. A large skip will be arriving at some stage for the rubbish removal.  If you have any comments please e mail clerk@westwoodparishcouncil.gov.uk Please clisk on th efollowing link for the full proposal.

HUB-proposal-2025